Skip to main content Skip to search Skip to main navigation
Skip product gallery

Zubehör

Eisennägel
Eisennagel- sparen Zeit und schonen die Schalung.
Skip product gallery

Ähnliche Artikel

Formwork stop round
For fixing the formwork in the lower area. PVC block: This stop is attached off-center with a steel nail and adjusted by turning, then fixed in the center.
Formwork stop GFK conrete grey
Formwork stop made of fibreglass. Pins Ø: 10 mm; Length: 100 mm ADVANTAGES: Non-corrosive High strength and stable Chemical resistance Fast and easy installation INSTALLATION: Mark the position of the formwork with a snap line. Drill periodically holes with a diameter of 10mm along the marking. ATTENTION: Please consider the length of the pins. 
Skip product gallery

Customers also viewed

ZZ-batten
Skidproofed and tilt secured spacer for the bottom reinforcement. There will be no shrinking as the concrete encloses the batten completly. Due to the special form a linear interruption can be avoided. Mill lenghts 200 cm. Other lenghts available.
Rundfix (PVC-free)
PVC- free spacers for vertical reinforcement.  
spacers with nail holes made of plastic
spacers made of impact-resistant material for breaking edges on square columns and beams, but also for decorating large exposed concrete parts. Provide nail holes every 10-15 cm for fastening.
VIBA - aerial work platform type 2000 galv. Height max. 2 m
with control element 230 Vload capacity 3t Technical specifications: 800 kg / m², max. 3000 kg, pull-outs max. 125 kg stepless from 0.4 - 1.99 m (without wheelset) Platform size: 1.68 x 3.16 - 5.16 m
Montagekleber mit Anfangshaftung
Leistungsstarker Montagekleber (Kartusche á 450g) mit sofortiger Anfangshaftung. Frei von Isocyanat und Silicon. Dauerelastisch und universell einsetzbar. Geruchlos. Zur Verarbeitung mit allen gängigen Dosierpistolen.
Baustütze - Mini (DC)
With covered thread (DC). Headplate: 120 x 120 x 5 mm, with borehol ø 40 mm G-hook: Ø 12 mm (no loosing) with bearing ring (loose) Failure loads tested at concentric load, pay attention to security factor!
ZZ-batten
Skidproofed and tilt secured spacer for the bottom reinforcement. There will be no shrinking as the concrete encloses the batten completly. Due to the special form a linear interruption can be avoided. Mill lenghts 200 cm. Other lenghts available.
SBA basket
These spacer-baskets are situated between the upper and the lower reinforcment panels. They don't sit on the formwork (no plastic feet), therefore a proper exposed concrete can be arised.Packing units: big band at 800, 600, 400, 200 pieces, small band at 10 pieces.