Skip to main content Skip to search Skip to main navigation
Skip product gallery

Customers also viewed

Form bar, galvanized
The allowed distance e of the form bars depends on the thickness of the ceiling: by d < 20 cm: permitted e = 150 cm by d = max D = 30 cm: permitted e = 75 cm  Height of the bar: 100 cm Height overall: 130 cm
Stop end formwork made of woodconcrete
Stop end formwork made of woodconcrete. Element length - 200 cm Material strength -  10 mm Width at foot - 70 mm
Deckenrandschalung XPS 35 FZ ISO
Slab edge shuttering and insulation in one. 35 mm extruded polystyrene. Foot is made of 4mm fibre cement (Width 10 cm) Elements with tongue and groove. Standard in 1 or 2 metre elements, other lengths on request.
Leibungsschalungswinkel verzinkt
Galvanized formwork bracket: Inexpensive Versatile in use Can be attached with screws or nails (3 screws or 5 nails are required per side)
Deckenrandschalung XPS 50 FZ ISO
Slab edge shuttering and insulation in one. 50 mm extruded polystyrene. Foot is made of 4mm fibre cement (Width 10 cm) Elements with tongue and groove. Standard in 1 or 2 metre elements, other lengths on request.
Strukturmatten / Matrizen für Betonwand
Textured formliners from Schalbau Vitzthum in various designs for your exposed concrete wall. The mats can be attached to the formwork either with glue or nails. Processing instructions in the download tab. Tolerance range length and width +/- 2.0 mm
VIBA-Flex Joint sheet 150 mm with mounting-base
Available in one side and both side coated design Without fixing clip.
Masonry tie channels Type HMS 25/15-D galv.
To fixtate outgoing masonry walls on concrete. The brick tie anchors can be used at any desired position across the total length of the brick tie channel.
Speedies Bar Spacer 20 mm
Application: For concreting floors or concrete slabs as spacers of the lower preservation. Furthermore, the Speedies surface spacers can also be used very well in the concrete precast plant due to the pointed feet. Your advantage: Material polypropylene PP Pressure resistant / Very high stability Ergonomic Transport optimized (europallet) Consumption approx. 1-1,5 pcs./m² Product is patent pending MPA-tested
KG-tube implementation
MPA geprüft! Die KG-Rohrdurchführungen werden in den Durchmessern DN 100 bis DN 200 gefertigt. Alle gängigen Wandstärken von 200 bis 400 mm sind einbaufertig als Doppelmuffenrohr sofort aus Lagervorrat lieferbar. Die Rohrdurchführung ist werkseitig mittig mit einem Mauerkragen versehen, der verhindert, dass Feuchtigkeit ins Bauwerk eindringen kann. Die Rohrdurchführungen eignen sich für den Beton- und Mauerwerksbau. Die druckwasserdichten Hauseinführungen haben eine hohe Witterungs- und Ozonbeständigkeit, sowie eine gute Säure- und Laugenbeständigkeit. Sie können in Bereichen von -30°C bis +100° C eingesetzt werden. Lieferung:Die KG-Rohrdurchführung wird auf Wandstärke gefertigt geliefert.Pro Rohrdurchführung sind zwei Dichtungen und zwei Schalungs- bzw. Verschlussdeckel im Lieferumfang enthalten.Montage KG-Muffenstopfen an die Wandschalung nageln Dichtung in die Rohrdurchführung einlegen. Rohrdurchführung auf den Muffenstopfen schieben. Die zweite Seite der Rohrdurchführung mit dem Stopfen verschließen und mit einem von aussen durch die Schalung geschlagenen Nagel fixieren