The sealing is used at exposed concrete construction between pressure cone and formwork shell. It helps to secure a perfect concrete surface.
The high-quality exposed concrete cones are bonded, with contact adhesive X1, in the remaining opening after removing the pressure cones. Apply the contact adhesive on the backside to obtain a clean visible area.
The high-quality, precisely tailored exposed concrete cone is glued in flush after the pressure cones have been removed in order to achieve a clean visible surface.
Formwork spacer tube "made of one piece" with two sealing plugs. Secure the wall thickness reliably! Material: HDPE
Spacer tubes with a roughened surface from Ø 20mm to Ø 40 mm in bundles Ø 20mm to Ø 22mm 100 running meters per bundle Ø 26mm to Ø 32mm 50 running meters per bundle Ø 40mm 30 running meters per bundle
The pressure cones are attached to the spacer tube. After concreting, the pressure cones are removed from the concrete and can be reused.
Viewed